- Buy
- Rent
- Commercial
- Find an Agent
1803 Upper Elgin River Rd, Elgin, TX 78621
TX/Bastrop/Elgin/78621/1803 Upper Elgin River Rd, Elgin, TX 786211803 Upper Elgin River Rd, Elgin, TX 78621
1803 Upper Elgin River Rd, Elgin, TX 78621
Lot for Sale by Harold Xia, Forever Realty, LLC.
- Overview
- Details
- Open Houses
- More
Prime opportunity with this expansive 185.74-acre plot in Bastrop County along Upper Elgin River Road. Witness the transformation of this area into a future ‘Silicon Valley’ and ‘Hollywood destination.’ The land spans 2050 linear feet of frontage along Upper Elgin River Road, 15 minutes from Tesla HQ and Giga factory, and 5 minutes from the under-construction X (formerly Twitter) headquarters, SpaceX Starlink factory, and the Boring Company. Nearby, Spiderwood Studios, Greenpoint private airport, and Ad Astra School, backed by Elon Musk, are key highlights. Lennar Corp. is developing "Snailbrook," a 110-home subdivision next to the Boring Company HQ. Bastrop’s rapid development continues: SpaceX and the city are investing $8.5 million in wastewater infrastructure to support new facilities, expected by 2026. The 522-acre movie studio project will feature large studios, sound stages, and office space, with phase 1 set to open in 2025, bringing a $1.3 billion economic boost. Austin developer C&A’s projects include a 5,426-acre aviation tech park and a 1,000-acre resort, complete with casinos, hotels, and entertainment aimed at creating a self-sustaining environment with green energy, food production, and water management. This will redefine Bastrop’s landscape, attracting major companies and generating investment. Additionally, HEB plans of a $28 million expansion, and the recent purchase a 40,000-square-foot factory by Samsung’s supplier LS Electronic are solidifying Bastrop’s position as a hub for innovation and growth. With its strategic location, Bastrop is set to become one of Texas' most dynamic areas for business and lifestyle. The agriculture/wildlife exempt land features mature oak, pecan, and elm trees, along with three ponds and a natural creek frequented by ducks and deer. Aqua-water and electricity infrastructure are in place, with a preliminary development plan and water feasibility study completed, offering a solid foundation for future development.